Dunbeg South Wind Farm - Extension (16.8 MW)

Dunbeg South Wind Farm - Extension is a 16.8 MW wind farm project in Causeway Coast and Glens, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 1 November 2024, no decision recorded; the record was last updated on 8 June 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

16.8 MWwind farm
application submittedstatus in REPD
8 June 2026record last updated
Causeway Coast and Glenscouncil area

Planning timeline

DateStage
1 November 2024Application submitted

Project details

Technology
wind farm
Capacity
16.8 MW
Status (REPD)
application submitted
Record last updated
8 June 2026
Operator or applicant
Renewable Energy Systems (RES) / Innagreen Investments
Planning authority
Causeway Coast and Glens
Planning application reference
LA01/2024/1221/F
Turbines
4
Turbine height
150 m
Address (REPD)
Lands approx 6km N E of, Limavady Road, Derry, Co Londonderry
Council area (by location)
Causeway Coast and Glens
REPD reference
17627

Who decides

ApplicationsCauseway Coast and GlensUK
Decided applications (solar, wind, battery)4710,236
Refused6 (13%)19%
Solar refused0 of 412%
Onshore wind refused6 of 4145%
Battery storage refused0 of 216%
Median time from submission to decision103.0 weeks17.0 weeks
Appeals lodged / allowed5 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Dunbeg South Wind Farmwind farm29.7approved, not built<0.1
Dunbeg Extensionwind farm9approved, not built1.9
Dunmore Wind Farm - extensionwind farm24approved, not built2.1
Dunmorewind farm21operational2.1
Windyhill Road (Dunbeg) Wind Farmwind farm42operational2.4
Rigged Hill Wind Farm (Repowering)wind farm28approved, not built5.5
Rigged Hill Wind Farmwind farm5operational5.8
Croaghanwind farm12.5application withdrawn5.8
Windy Hillwind farm52.5appeal withdrawn7.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.0694, -6.8555).