Windyhill Road (Dunbeg) Wind Farm (42 MW)

Windyhill Road (Dunbeg) Wind Farm is a 42 MW wind farm project in Causeway Coast and Glens, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 14 November 2014; the record was last updated on 3 January 2017.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

42 MWwind farm
operationalstatus in REPD
3 January 2017record last updated
Causeway Coast and Glenscouncil area

Planning timeline

DateStage
11 December 2007Application submitted
18 March 2010Refused by the planning authority
27 January 2011Planning permission granted
27 January 2011Appeal allowed
1 December 2013Construction started
14 November 2014Operational

Project details

Technology
wind farm
Capacity
42 MW
Status (REPD)
operational
Record last updated
3 January 2017
Operator or applicant
Gaelectric Developments/ CGN Europe Energy
Planning authority
Causeway Coast and Glens
Planning application reference
B/2007/0560/FUL
Appeal reference
2009/A0363
Turbines
14
Address (REPD)
Picnic Area, Dunbeg Townland, Limavady, Co Londonderry. BT45
Council area (by location)
Causeway Coast and Glens
Time to decision
163 weeks
REPD reference
4142

Who decides

ApplicationsCauseway Coast and GlensUK
Decided applications (solar, wind, battery)4710,236
Refused6 (13%)19%
Solar refused0 of 412%
Onshore wind refused6 of 4145%
Battery storage refused0 of 216%
Median time from submission to decision103.0 weeks17.0 weeks
Appeals lodged / allowed5 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Dunbeg Extensionwind farm9approved, not built0.6
Dunmore Wind Farm - extensionwind farm24approved, not built1.3
Dunmorewind farm21operational1.3
Dunbeg South Wind Farm - Extensionwind farm16.8application submitted2.4
Dunbeg South Wind Farmwind farm29.7approved, not built2.4
Windy Hillwind farm52.5appeal withdrawn7.3
Rigged Hill Wind Farm (Repowering)wind farm28approved, not built7.6
Croaghanwind farm12.5application withdrawn7.8
Rigged Hill Wind Farmwind farm5operational7.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.0804, -6.8886).