East Pye Solar Farm (500 MW)

East Pye Solar Farm is a 500 MW solar farm project in South Norfolk, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 2 April 2026, no decision recorded; the record was last updated on 1 May 2026. As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (EN0110014).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

500 MWsolar farm
application submittedstatus in REPD
1 May 2026record last updated
South Norfolkcouncil area

Planning timeline

DateStage
2 April 2026Application submitted

Project details

Technology
solar farm
Capacity
500 MW
Status (REPD)
application submitted
Record last updated
1 May 2026
Operator or applicant
Island Green Power
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application reference
EN0110014
Site area
12,123.0 ha
Address (REPD)
Btw Norwich Main and Bramford, Hempnall, Norwich
Council area (by location)
South Norfolk
REPD reference
17494

The scheme also includes battery storage, recorded separately in REPD (application submitted).

Who decides

As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (EN0110014). All Energy Secretary decisions on solar and wind farms. The Planning Inspectorate - National Infrastructure refused 7% of 46 decided solar, wind and battery applications in REPD (median 73 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Hill Farm, Wacton Roadbattery storage120approved, not built3.4
Market Lane And Carr Lane, Great Moultonbattery storage400application submitted4.0
Hall Farm Solar parksolar farm15operational5.2
Station Road, Tivetshall St Margaretsolar farm20approved, not built5.7
Streetwood Wind Farmwind farm12refused6.1
Tivetshall St Mary Wind Farmwind farm9application withdrawn6.6
Hempnallwind farm21refused on appeal6.7
Pulham Airfieldwind farm14application withdrawn7.3
Upper Vaunces Wind Farmwind farm6refused7.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.4733, 1.2433).