Streetwood Wind Farm (12 MW)
Streetwood Wind Farm is a 12 MW wind farm project in South Norfolk, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 27 October 2014; the record was last updated on 16 September 2014.
12 MWwind farm
refusedstatus in REPD
16 September 2014record last updated
South Norfolkcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 21 January 2013 | Application submitted |
| 31 October 2013 | Appeal lodged |
| 27 October 2014 | Refused by the planning authority |
| 27 October 2014 | Secretary of State refused |
Project details
- Technology
- wind farm
- Capacity
- 12 MW
- Status (REPD)
- refused
- Record last updated
- 16 September 2014
- Operator or applicant
- TCI Renewables
- Planning authority
- South Norfolk
- Planning application reference
- 2013/0105
- Appeal reference
- 13/00042/AGNDET
- Turbines
- 3
- Address (REPD)
- Land surrounding, Busseys Loke, Hempnall, Norfolk
- Council area (by location)
- South Norfolk
- Time to decision
- 92 weeks
- REPD reference
- 4536
Who decides
| Applications | South Norfolk | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 50 | 10,236 |
| Refused | 8 (16%) | 19% |
| Solar refused | 1 of 30 | 12% |
| Onshore wind refused | 7 of 7 | 45% |
| Battery storage refused | 0 of 13 | 16% |
| Median time from submission to decision | 20.6 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Hempnall | wind farm | 21 | refused on appeal | 0.6 |
| Hall Farm Solar park | solar farm | 15 | operational | 1.1 |
| Bloy’s Grove Solar Farm | solar farm | 49.9 | approved, not built | 5.9 |
| East Pye Solar Farm | solar farm | 500 | application submitted | 6.1 |
| Land south of Brick Kiln Road | solar farm | 5 | operational | 6.7 |
| Stoke Lane | battery storage | 130 | approved, not built | 7.0 |
| Flordon Road, Bracon Ash Solar Panels & Battery Storage | solar farm | 24 | approved, not built | 7.6 |
| Wymondham Road, Bracon Ash | battery storage | 228 | application submitted | 7.6 |
| Hill Farm, Wacton Road | battery storage | 120 | approved, not built | 7.8 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.5071, 1.3149).