Wymondham Road, Bracon Ash (228 MW battery storage)
Wymondham Road, Bracon Ash is a 228 MW battery storage project in South Norfolk, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 31 March 2025, no decision recorded; the record was last updated on 9 May 2025.
228 MWbattery storage
application submittedstatus in REPD
9 May 2025record last updated
South Norfolkcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 31 March 2025 | Application submitted |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 228 MW
- Status (REPD)
- application submitted
- Record last updated
- 9 May 2025
- Operator or applicant
- Green Switch Capital
- Planning authority
- South Norfolk
- Planning application reference
- 2025/0806
- Address (REPD)
- W/O Wymondham Road, Bracon Ash, Norwich
- Council area (by location)
- South Norfolk
- Name in REPD
- Wymondham Road, Bracon Ash - Battery Energy Storage System
- REPD reference
- 18621
Who decides
| Applications | South Norfolk | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 50 | 10,236 |
| Refused | 8 (16%) | 19% |
| Solar refused | 1 of 30 | 12% |
| Onshore wind refused | 7 of 7 | 45% |
| Battery storage refused | 0 of 13 | 16% |
| Median time from submission to decision | 20.6 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Flordon Road, Bracon Ash Solar Panels & Battery Storage | solar farm | 24 | approved, not built | 0.8 |
| Bracon Ash Solar | solar farm | 28.5 | under construction | 2.6 |
| Land south of Brick Kiln Road | solar farm | 5 | operational | 2.9 |
| Bloy’s Grove Solar Farm | solar farm | 49.9 | approved, not built | 3.9 |
| Lotus Manufacturing | wind farm | 6 | refused | 4.0 |
| Hornsea Project Three | battery storage | 300 | under construction | 4.7 |
| Hall Farm, Hickling Lane | battery storage | 400 | application submitted | 4.8 |
| Hill Farm, Wacton Road | battery storage | 120 | approved, not built | 5.2 |
| Stoke Lane | battery storage | 130 | approved, not built | 5.3 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.5384, 1.2144).