Foxhounds Lane, Southfleet (300 MW battery storage)

Foxhounds Lane, Southfleet is a 300 MW battery storage project in Dartford, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 4 December 2024; the record was last updated on 13 January 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

300 MWbattery storage
refusedstatus in REPD
13 January 2025record last updated
Dartfordcouncil area

Planning timeline

DateStage
17 April 2024Application submitted
4 December 2024Refused by the planning authority

Project details

Technology
battery storage (stand-alone storage)
Capacity
300 MW
Status (REPD)
refused
Record last updated
13 January 2025
Operator or applicant
EcoDev Group Limited
Planning authority
Dartford
Planning application reference
24/00166/FUL
Address (REPD)
Foxhounds Lane Southfleet
Council area (by location)
Dartford
Time to decision
33 weeks
Name in REPD
Foxhounds Lane, Southfleet - Battery Storage
REPD reference
11186

Who decides

ApplicationsDartfordUK
Decided applications (solar, wind, battery)1810,236
Refused1 (6%)19%
Solar refused0 of 1312%
Battery storage refused1 of 516%
Median time from submission to decision9.0 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
New Barn Roadbattery storage35approved, not built0.6
Dartford BESSbattery storage300application withdrawn0.6
Broadditch Battery Energybattery storage11operational1.3
Thames Way, Northfleetbattery storage100application submitted1.7
Tilbury Dockswind farm12operational3.9
Bean Lanebattery storage104application withdrawn4.5
Land Adjacent Davanden Kennelsbattery storage7.5abandoned5.4
Thurrock Flexible Generation Plantbattery storage150operational5.9
Idleigh Court Road, New Ash Greensolar farm49.9application submitted6.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.4235, 0.3195).