Thames Way, Northfleet (100 MW battery storage)
Thames Way, Northfleet is a 100 MW battery storage project in Gravesham, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 14 August 2025, no decision recorded; the record was last updated on 26 September 2025.
100 MWbattery storage
application submittedstatus in REPD
26 September 2025record last updated
Graveshamcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 14 August 2025 | Application submitted |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 100 MW
- Status (REPD)
- application submitted
- Record last updated
- 26 September 2025
- Operator or applicant
- Speedgreen Limited
- Planning authority
- Gravesham
- Planning application reference
- 20250730
- Address (REPD)
- Thames Way, Northfleet, Gravesend
- Council area (by location)
- Gravesham
- Name in REPD
- Thames Way, Northfleet - Battery Energy Storage
- REPD reference
- 18128
Who decides
Gravesham has 2 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Foxhounds Lane, Southfleet | battery storage | 300 | refused | 1.7 |
| New Barn Road | battery storage | 35 | approved, not built | 2.3 |
| Dartford BESS | battery storage | 300 | application withdrawn | 2.3 |
| Tilbury Docks | wind farm | 12 | operational | 2.3 |
| Broadditch Battery Energy | battery storage | 11 | operational | 2.6 |
| Thurrock Flexible Generation Plant | battery storage | 150 | operational | 4.2 |
| The Place Solar Farm | solar farm | 23.2 | refused | 4.8 |
| Bean Lane | battery storage | 104 | application withdrawn | 5.1 |
| Land Adjacent Davanden Kennels | battery storage | 7.5 | abandoned | 5.7 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.4365, 0.3331).