Thurrock Flexible Generation Plant (150 MW battery storage)

Thurrock Flexible Generation Plant is a 150 MW battery storage project in Thurrock, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational; the record was last updated on 26 August 2025. As a nationally significant project, it was decided by the Secretary of State responsible for energy at the time on a Development Consent Order after examination by the Planning Inspectorate (EN010092).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

150 MWbattery storage
operationalstatus in REPD
26 August 2025record last updated
Thurrockcouncil area

Planning timeline

DateStage
10 June 2020Application submitted
16 February 2022Development consent granted (Secretary of State)
1 July 2023Construction started

Project details

Technology
battery storage (co-located with fossil fuel plant)
Capacity
150 MW
Status (REPD)
operational
Record last updated
26 August 2025
Operator or applicant
Thurrock Power
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application reference
EN010092
Address (REPD)
Thurrock Flexible Generation Plant Fort Road Tilbury
Council area (by location)
Thurrock
Time to decision
88 weeks
REPD reference
7696

Official project record at the Planning Inspectorate (EN010092)

Who decides

As a nationally significant project, it was decided by the Secretary of State responsible for energy at the time on a Development Consent Order after examination by the Planning Inspectorate (EN010092). All Energy Secretary decisions on solar and wind farms. The Planning Inspectorate - National Infrastructure refused 7% of 46 decided solar, wind and battery applications in REPD (median 73 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
The Place Solar Farmsolar farm23.2refused2.4
Barvills Solar Farmsolar farm5operational3.2
Tilbury Energy Centrebattery storage100abandoned3.2
Tilbury Dockswind farm12operational3.3
Thames Way, Northfleetbattery storage100application submitted4.2
Foxhounds Lane, Southfleetbattery storage300refused5.9
Broadditch Battery Energybattery storage11operational6.2
New Barn Roadbattery storage35approved, not built6.5
Dartford BESSbattery storage300application withdrawn6.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.4577, 0.3838).