Tilbury Energy Centre (100 MW battery storage)

Tilbury Energy Centre is a 100 MW battery storage project in Thurrock, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: abandoned; the record was last updated on 31 January 2020. As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

100 MWbattery storage
abandonedstatus in REPD
31 January 2020record last updated
Thurrockcouncil area

Planning timeline

DateStage
20 February 2018Application submitted

Project details

Technology
battery storage (co-located with fossil fuel plant)
Capacity
100 MW
Status (REPD)
abandoned
Record last updated
31 January 2020
Operator or applicant
RWE Generation
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application reference
not recorded
Address (REPD)
Tilbury Power Station, Tilbury, Thurrock
Council area (by location)
Thurrock
REPD reference
7048

Who decides

As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate. All Energy Secretary decisions on solar and wind farms. The Planning Inspectorate - National Infrastructure refused 7% of 46 decided solar, wind and battery applications in REPD (median 73 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Barvills Solar Farmsolar farm5operational1.2
Thurrock Flexible Generation Plantbattery storage150operational3.2
The Place Solar Farmsolar farm23.2refused4.8
Tilbury Dockswind farm12operational6.4
Gateway Energy Centrebattery storage450approved, not built7.0
Thames Way, Northfleetbattery storage100application submitted7.3
Marsh Farm, Fobbing Solar Arrays & Battery Storagesolar farm49.9application withdrawn7.9
Land adjacent to the former Coryton Refinerysolar farm5abandoned8.8
Foxhounds Lane, Southfleetbattery storage300refused8.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.4623, 0.4295).