Funtley Solar Photovoltaic PV Farm (10.5 MW)

Funtley Solar Photovoltaic PV Farm is a 10.5 MW solar farm project in Winchester, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 5 September 2024, no decision recorded; the record was last updated on 28 October 2024.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10.5 MWsolar farm
application submittedstatus in REPD
28 October 2024record last updated
Winchestercouncil area

Planning timeline

DateStage
5 September 2024Application submitted

Project details

Technology
solar farm
Capacity
10.5 MW
Status (REPD)
application submitted
Record last updated
28 October 2024
Operator or applicant
Private Developer
Planning authority
Winchester
Planning application reference
HCC/2024/0503
Site area
23.4 ha
Address (REPD)
The Funtley Refuse Tip (Former), Titchfield Lane, Wickham, Fareham
Council area (by location)
Winchester
REPD reference
17202

Earlier applications for this site

ApplicationMWSubmittedOutcome
Funtley Solar Photovoltaic PV Farm HCC/2021/070110.518 November 2021withdrawn 7 September 2023

Who decides

ApplicationsWinchesterUK
Decided applications (solar, wind, battery)3710,236
Refused4 (11%)19%
Solar refused0 of 2412%
Onshore wind refused3 of 345%
Battery storage refused1 of 1016%
Median time from submission to decision14.7 weeks17.0 weeks
Appeals lodged / allowed3 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Funtley Refuse Tipsolar farm10permission expired0.2
Titchfield Lanebattery storage49under construction0.3
Ash Farm, Titchfield Lanebattery storage15approved, not built0.5
Fontley House Farmsolar farm10approved, not built1.7
Titchfield Lane, Wickhamsolar farm49.9approved, not built2.6
Raglington Farmsolar farm5.8operational4.1
Newlands Farm Battery Storage Facility Phase 2battery storage40operational5.8
Newlands Farm Solarsolar farm20.5operational5.8
Tanners Lane Battery Energy Storage Facility (Phase One)battery storage40approved, not built5.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.8818, -1.2192).