Hill of Stroupster (36 MW wind farm)

Hill of Stroupster is a 36 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 7 November 2012; the record was last updated on 7 November 2012.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

36 MWwind farm
application withdrawnstatus in REPD
7 November 2012record last updated
Highlandcouncil area

Planning timeline

DateStage
7 November 2012Application withdrawn

Project details

Technology
wind farm
Capacity
36 MW
Status (REPD)
application withdrawn
Record last updated
7 November 2012
Operator or applicant
Npower Renewables
Planning authority
Highland
Planning application reference
07/00244/FUL
Turbines
12
Address (REPD)
Aukengill, Highland
Council area (by location)
Highland
REPD reference
3696

Who decides

ApplicationsHighlandUK
Decided applications (solar, wind, battery)16010,236
Refused68 (42%)19%
Solar refused0 of 1512%
Onshore wind refused61 of 11445%
Battery storage refused7 of 3116%
Median time from submission to decision52.3 weeks17.0 weeks
Appeals lodged / allowed20 / 20—

Other large projects within 10 km

ProjectTypeMWStatuskm
Tresdale Farm wind clusterwind farm6.9refused2.9
Hill of Stroupster Windfarmwind farm29.9operational7.5
Hollandmey Renewable Energy Developmentwind farm50approved, not built8.8
Hollandmey Renewable Energy Developmentsolar farm15approved, not built8.8
Philips Mains, Meybattery storage300approved, not built9.2
Scoolarywind farm120application withdrawn9.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (58.6391, -3.0715).