Tresdale Farm wind cluster (6.9 MW)
Tresdale Farm wind cluster is a 6.9 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 18 September 2017; the record was last updated on 4 October 2017.
6.9 MWwind farm
refusedstatus in REPD
4 October 2017record last updated
Highlandcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 14 May 2015 | Application submitted |
| 18 September 2017 | Refused by the planning authority |
Project details
- Technology
- wind farm
- Capacity
- 6.9 MW
- Status (REPD)
- refused
- Record last updated
- 4 October 2017
- Operator or applicant
- Coriolis Energy
- Planning authority
- Highland
- Planning application reference
- 15/01261/FUL
- Turbines
- 3
- Turbine height
- 100 m
- Address (REPD)
- Land 760M SE Of Tresdale Farm, Canisbay, Wick
- Council area (by location)
- Highland
- Time to decision
- 123 weeks
- REPD reference
- 2896
Who decides
| Applications | Highland | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 160 | 10,236 |
| Refused | 68 (42%) | 19% |
| Solar refused | 0 of 15 | 12% |
| Onshore wind refused | 61 of 114 | 45% |
| Battery storage refused | 7 of 31 | 16% |
| Median time from submission to decision | 52.3 weeks | 17.0 weeks |
| Appeals lodged / allowed | 20 / 20 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Hill of Stroupster | wind farm | 36 | application withdrawn | 2.9 |
| Hollandmey Renewable Energy Development | solar farm | 15 | approved, not built | 5.9 |
| Hollandmey Renewable Energy Development | wind farm | 50 | approved, not built | 5.9 |
| Hill of Stroupster Windfarm | wind farm | 29.9 | operational | 6.1 |
| Philips Mains, Mey | battery storage | 300 | approved, not built | 6.4 |
| Scoolary | wind farm | 120 | application withdrawn | 6.7 |
| Lochend Wind Farm | wind farm | 9.2 | operational | 9.3 |
| Lochend Holding, Barrock Wind Farm | battery storage | 10 | application submitted | 9.3 |
| Lochend Holding, Barrock Wind Farm | wind farm | 21 | application submitted | 9.3 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (58.6336, -3.1211).