J.W. Baldwin Wind Farm (6.8 MW)

J.W. Baldwin Wind Farm is a 6.8 MW wind farm project in Mid Suffolk, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 23 February 2012; the record was last updated on 23 February 2012.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6.8 MWwind farm
application withdrawnstatus in REPD
23 February 2012record last updated
Mid Suffolkcouncil area

Planning timeline

DateStage
23 February 2012Application withdrawn

Project details

Technology
wind farm
Capacity
6.8 MW
Status (REPD)
application withdrawn
Record last updated
23 February 2012
Operator or applicant
Eye Wind Power Ltd
Planning authority
Mid Suffolk
Planning application reference
0385/11
Turbines
2
Address (REPD)
South east of Eye Airfield, Suffolk
Council area (by location)
Mid Suffolk
REPD reference
2774

Who decides

ApplicationsMid SuffolkUK
Decided applications (solar, wind, battery)3310,236
Refused5 (15%)19%
Solar refused3 of 1912%
Onshore wind refused1 of 245%
Battery storage refused1 of 1216%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed2 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Yaxley, Eye Airfield Industrial Estatebattery storage200approved, not built0.7
Humphrey Groupwind farm5operational0.7
Red House Farm, Old Norwich Roadbattery storage520application submitted1.0
The Grange Solar Farm & Battery Storagesolar farm48approved, not built3.4
Solar Farm at Marsh Lane Solar Farm At Land North Of Lion Road Palgravesolar farm30approved, not built4.9
Suggenhall Farm - Photovoltaic Solar Array & Battery Storagesolar farm7.3approved, not built8.4
Semere Lane, Dickleburgh Solar Farmsolar farm49.9application submitted9.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.3304, 1.1266).