Jordanston Solar Farm (5 MW)

Jordanston Solar Farm is a 5 MW solar farm project in Pembrokeshire, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 28 March 2013; the record was last updated on 14 June 2013.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5 MWsolar farm
operationalstatus in REPD
14 June 2013record last updated
Pembrokeshirecouncil area

Planning timeline

DateStage
28 June 2012Application submitted
26 September 2012Planning permission granted
28 March 2013Operational

Project details

Technology
solar farm
Capacity
5 MW
Status (REPD)
operational
Record last updated
14 June 2013
Operator or applicant
AEE Renewables
Planning authority
Pembrokeshire
Planning application reference
12/0252/PA
Site area
10.7 ha
Address (REPD)
St Florence, Tenby, Dyfed
Council area (by location)
Pembrokeshire
Time to decision
13 weeks
REPD reference
1388

Who decides

ApplicationsPembrokeshireUK
Decided applications (solar, wind, battery)6110,236
Refused13 (21%)19%
Solar refused1 of 3112%
Onshore wind refused11 of 1645%
Battery storage refused1 of 1416%
Median time from submission to decision23.9 weeks17.0 weeks
Appeals lodged / allowed2 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Blackberry Lane Solar Farmsolar farm10approved, not built4.6
Alleston Solar Farmsolar farm30approved, not built6.8
West Farm, Cosheston Solar Farmsolar farm9under construction7.5
West Farm (Solar)solar farm7.7operational7.7
Golden Hillsolar farm6.2operational7.8
Yerbeston Gate Farmsolar farm6.1operational8.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.6754, -4.7959).