Knockodhar Wind Farm (100 MW)

Knockodhar Wind Farm is a 100 MW wind farm project in South Ayrshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 26 May 2023, no decision recorded; the record was last updated on 14 July 2023. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

100 MWwind farm
application submittedmay be out of datestatus in REPD
14 July 2023record last updated
South Ayrshirecouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
26 May 2023Application submitted

Project details

Technology
wind farm
Capacity
100 MW
Status (REPD)
application submitted
Record last updated
14 July 2023
Operator or applicant
REG Knockodhar Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00002153
Turbines
16
Turbine height
200 m
Address (REPD)
Knockodhar Wind Farm, 3.5 kilometres SW/O The Village Of Barr, Girvan
Council area (by location)
South Ayrshire
REPD reference
14295

The scheme also includes 20 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Assel Valley Wind Farmwind farm25operational4.6
Hadyard Hill extensionwind farm88application withdrawn4.9
Hadyard Hillwind farm120operational5.3
Clauchrie Windfarmwind farm100refused5.7
Clauchrie Windfarm Batterybattery storage25refused5.7
Tralorg Wind Farmwind farm20operational7.4
Mark Hillwind farm56operational9.4
Kilgalliochbattery storage100approved, not built9.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.2108, -4.7112).