Assel Valley Wind Farm (25 MW)

Assel Valley Wind Farm is a 25 MW wind farm project in South Ayrshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 28 October 2016; the record was last updated on 4 April 2017.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

25 MWwind farm
operationalstatus in REPD
4 April 2017record last updated
South Ayrshirecouncil area

Planning timeline

DateStage
1 June 2011Application submitted
3 September 2013Refused by the planning authority
3 September 2013Planning permission granted
3 September 2013Appeal allowed
15 May 2015Construction started
28 October 2016Operational

Project details

Technology
wind farm
Capacity
25 MW
Status (REPD)
operational
Record last updated
4 April 2017
Operator or applicant
Falck Renewables
Planning authority
South Ayrshire
Planning application reference
11/00564/APPM
Appeal reference
13/00008/8WEEK
Turbines
11
Address (REPD)
Pinmore, Girvan, Strathclyde
Council area (by location)
South Ayrshire
Time to decision
118 weeks
REPD reference
4645

Who decides

ApplicationsSouth AyrshireUK
Decided applications (solar, wind, battery)2010,236
Refused12 (60%)19%
Solar refused0 of 612%
Onshore wind refused12 of 1345%
Battery storage refused0 of 116%
Median time from submission to decision41.7 weeks17.0 weeks
Appeals lodged / allowed5 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Tralorg Wind Farmwind farm20operational3.1
Hadyard Hillwind farm120operational4.5
Knockodhar Wind Farmwind farm100application submitted4.6
Hadyard Hill extensionwind farm88application withdrawn4.7
Kilgalliochbattery storage100approved, not built5.0
Millenderdale Wind Farmwind farm15refused on appeal8.2
Breaker Hillwind farm7.2refused on appeal9.2
Kirk Hill Wind Farmwind farm18.8operational9.2
Clauchrie Windfarm Batterybattery storage25refused9.5