Moggerhanger Road, Sandy Solar Farm (7 MW)

Moggerhanger Road, Sandy Solar Farm is a 7 MW solar farm project in Central Bedfordshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 10 March 2022, no decision recorded; the record was last updated on 11 April 2022. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

7 MWsolar farm
application submittedmay be out of datestatus in REPD
11 April 2022record last updated
Central Bedfordshirecouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
10 March 2022Application submitted

Project details

Technology
solar farm
Capacity
7 MW
Status (REPD)
application submitted
Record last updated
11 April 2022
Operator or applicant
Kach Capital Estates Limited
Planning authority
Central Bedfordshire
Planning application reference
CB/22/00752/FULL
Site area
5.6 ha
Address (REPD)
N/O Moggerhanger Road, Sandy, Buntingford
Council area (by location)
Central Bedfordshire
Name in REPD
Moggerhanger Road, Sandy - Solar Farm
REPD reference
9349

The scheme also includes 20 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

ApplicationsCentral BedfordshireUK
Decided applications (solar, wind, battery)5910,236
Refused8 (14%)19%
Solar refused4 of 3612%
Onshore wind refused2 of 745%
Battery storage refused2 of 1616%
Median time from submission to decision19.6 weeks17.0 weeks
Appeals lodged / allowed1 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Lowfield Farm Solar Farmsolar farm26.5approved, not built3.0
Waterloo solar parksolar farm14.6operational4.2
Solar Farm & Battery Storage at N/O Northill Roadsolar farm49.9application submitted4.8
Dunton Lanebattery storage177approved, not built7.3
Dunton Lanebattery storage200approved, not built7.8
Langford Wind Farmwind farm20operational8.6
Abbotsley Country Homes, Drewels Lane Solar Farmsolar farm49.9approved, not built8.7
Cobholden Solar Farmsolar farm49.9approved, not built10.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.1271, -0.3055).