Monkwith Wind Farm (6.9 MW)
Monkwith Wind Farm is a 6.9 MW wind farm project in East Riding of Yorkshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 7 January 2011; the record was last updated on 6 December 2011.
6.9 MWwind farm
refused on appealstatus in REPD
6 December 2011record last updated
East Riding of Yorkshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 12 June 2009 | Application submitted |
| 21 January 2010 | Refused by the planning authority |
| 7 January 2011 | Appeal refused |
Project details
- Technology
- wind farm
- Capacity
- 6.9 MW
- Status (REPD)
- refused on appeal
- Record last updated
- 6 December 2011
- Operator or applicant
- Energiekontor UK
- Planning authority
- East Riding of Yorkshire
- Planning application reference
- 09/02000/STPLFE
- Appeal reference
- 10/00069/REFUSE
- Turbines
- 3
- Address (REPD)
- Hogsea Lane, Tunstall, Hull,
- Council area (by location)
- East Riding of Yorkshire
- Time to decision
- 32 weeks
- REPD reference
- 3512
Earlier applications for this site
| Application | MW | Submitted | Outcome |
|---|---|---|---|
| Monkwith Wind Farm 07/01140/STPLFE | 14 | 23 February 2007 | refused 18 October 2007 |
Who decides
| Applications | East Riding of Yorkshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 143 | 10,236 |
| Refused | 26 (18%) | 19% |
| Solar refused | 1 of 59 | 12% |
| Onshore wind refused | 24 of 63 | 45% |
| Battery storage refused | 1 of 21 | 16% |
| Median time from submission to decision | 18.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 4 / 10 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Tedder Hill Wind cluster | wind farm | 7.5 | operational | 1.6 |
| Roos Wind Farm (Resubmission) | wind farm | 17.1 | operational | 1.9 |
| Burton Pidsea (Wadworth Hill) Wind Farm | wind farm | 10.2 | operational | 4.7 |
| Elstronwick, Burstwick - Daisy Hill Solar Photovoltaic Farm | solar farm | 35 | approved, not built | 6.7 |
| Redhall Industrial Estate | solar farm | 5 | operational | 7.3 |
| Eastfield Farm Wind Farm | wind farm | 11.4 | refused | 9.1 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.7612, -0.0456).