New Rides Farm - Photovoltaic Panels (10 MW solar farm)

New Rides Farm - Photovoltaic Panels is a 10 MW solar farm project in Swale, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 30 September 2021, not yet built; the record was last updated on 17 February 2026. REPD records the planning permission as expiring on 30 September 2024, but the project holds a Contracts for Difference award (AR7a), so construction may have started. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10 MWsolar farm
approved, not builtmay be out of datestatus in REPD
17 February 2026record last updated
Swalecouncil area

REPD records the planning permission as expiring on 30 September 2024, but the project holds a Contracts for Difference award (AR7a), so construction may have started.

Planning timeline

DateStage
21 June 2021Application submitted
30 September 2021Planning permission granted
30 September 2024Permission expired

Project details

Technology
solar farm
Capacity
10 MW
Status (REPD)
approved, not built
Record last updated
17 February 2026
Operator or applicant
EnergieKontor UK Limited
Planning authority
Swale
Planning application reference
21/503240/FULL
Site area
16.5 ha
Address (REPD)
New Rides Farm, 820 Leysdown Road, Eastchurch, Sheerness
Council area (by location)
Swale
Time to decision
14 weeks
Contracts for Difference
AR7a
REPD reference
9270

Who decides

ApplicationsSwaleUK
Decided applications (solar, wind, battery)4010,236
Refused5 (12%)19%
Solar refused4 of 3012%
Onshore wind refused1 of 345%
Battery storage refused0 of 716%
Median time from submission to decision15.1 weeks17.0 weeks
Appeals lodged / allowed3 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
New Rides Wind Farmwind farm8.8operational0.2
Old Rides solar Farmsolar farm8operational0.7
Old Rides Farm, Leysdown Roadbattery storage1,000application submitted1.0
South Lees Farmsolar farm11operational4.1
Land off Queenborough Roadbattery storage40under construction6.8
Cleve Hill Solar Projectsolar farm373operational7.4
Tonge Corner Farmsolar farm22operational7.5
Plot 2B EurolinkVbattery storage20under construction8.8
Ridham Avenue, Swale Way - Kemsley Battery Energy Storagebattery storage249approved, not built9.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.398, 0.8648).