Penrhys Wind Farm/Ferndale Power Factory (6.4 MW)

Penrhys Wind Farm/Ferndale Power Factory is a 6.4 MW wind farm project in Rhondda Cynon Taf, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 8 June 2011; the record was last updated on 6 November 2013.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6.4 MWwind farm
operationalstatus in REPD
6 November 2013record last updated
Rhondda Cynon Tafcouncil area

Planning timeline

DateStage
11 February 2003Application submitted
9 January 2004Refused by the planning authority
1 March 2005Planning permission granted
1 March 2005Appeal allowed
1 April 2010Construction started
8 June 2011Operational

Project details

Technology
wind farm
Capacity
6.4 MW
Status (REPD)
operational
Record last updated
6 November 2013
Operator or applicant
John Laing Environmental Assets Group
Planning authority
Rhondda Cynon Taf
Planning application reference
03/0226
Appeal reference
App/L6940/A/04/754
Turbines
8
Address (REPD)
Penrhys Rhondda Mid Glamorgan
Council area (by location)
Rhondda Cynon Taf
Time to decision
107 weeks
REPD reference
3660

Who decides

ApplicationsRhondda Cynon TafUK
Decided applications (solar, wind, battery)3410,236
Refused5 (15%)19%
Solar refused0 of 1312%
Onshore wind refused3 of 1545%
Battery storage refused2 of 616%
Median time from submission to decision28.9 weeks17.0 weeks
Appeals lodged / allowed0 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Wind Turbines at Mynydd Y Glyn Wind Farmwind farm30approved, not built2.6
Llwyncelyn Wind Farmwind farm7.2application submitted4.9
Abergorki Wind Farmwind farm13.5approved, not built4.9
Mynydd Pen-y-Graig Wind Farmwind farm15application withdrawn5.1
Fforch Nest Wind Farm pt1wind farm10operational5.4
Fforch Nest Wind Farmwind farm16abandoned5.4
Pant y walwind farm25operational5.6
Fforch Nest Wind Farm pt2wind farm17.5operational5.8
Trane Renewable Energy Parkwind farm11.9application withdrawn6.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.6511, -3.4512).