Port of Tyne (35 MW battery storage)

Port of Tyne is a 35 MW battery storage project in South Tyneside, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 July 2018; the record was last updated on 9 May 2019.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

35 MWbattery storage
operationalstatus in REPD
9 May 2019record last updated
South Tynesidecouncil area

Planning timeline

DateStage
7 September 2016Application submitted
1 April 2018Construction started
1 July 2018Operational

Project details

Technology
battery storage (stand-alone storage)
Capacity
35 MW
Status (REPD)
operational
Record last updated
9 May 2019
Operator or applicant
Foresight
Planning authority
South Tyneside
Planning application reference
ST/0867/16/FUL
Address (REPD)
Port of Tyne, Tyne Dock, South Shields, Tyne & Wear
Council area (by location)
South Tyneside
REPD reference
6976

Who decides

ApplicationsSouth TynesideUK
Decided applications (solar, wind, battery)1210,236
Refused1 (8%)19%
Solar refused0 of 912%
Onshore wind refused0 of 145%
Battery storage refused1 of 216%
Median time from submission to decision6.1 weeks17.0 weeks
Appeals lodged / allowed1 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Church Bankbattery storage100application submitted1.0
Standby Embedded Stor Power Plantbattery storage20under construction3.4
West Boldon Substationbattery storage60approved, not built4.3
E/o the Academy Of Light, Sunderland Road Solar Farmsolar farm40application submitted5.6
Tynemouth Energy Storage System (TESS)battery storage25operational6.2
Washington Road Solar Farmsolar farm20approved, not built6.3
Woodhouse Farmsolar farm11refused8.0
Usworth House Farm, Peareth Hall Road Solar Farmsolar farm27.3refused8.4
Benton Lane, Quorum Business Parksolar farm8application submitted9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.9773, -1.4559).