Power Generation Development in Islandmagee (100 MW battery storage)

Power Generation Development in Islandmagee is a 100 MW battery storage project in Mid and East Antrim, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 27 June 2023, no decision recorded; the record was last updated on 15 December 2025. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

100 MWbattery storage
application submittedmay be out of datestatus in REPD
15 December 2025record last updated
Mid and East Antrimcouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
27 June 2023Application submitted

Project details

Technology
battery storage (stand-alone storage)
Capacity
100 MW
Status (REPD)
application submitted
Record last updated
15 December 2025
Operator or applicant
Heron Storage Limited
Planning authority
Mid and East Antrim
Planning application reference
LA02/2023/1577/F
Address (REPD)
Lands Approximately 950m SE of Ballylumford Power Stn. And , Approximately 40m, Islandmagee
Council area (by location)
Mid and East Antrim
REPD reference
20022

Who decides

ApplicationsMid and East AntrimUK
Decided applications (solar, wind, battery)3010,236
Refused5 (17%)19%
Solar refused0 of 612%
Onshore wind refused5 of 2245%
Battery storage refused0 of 216%
Median time from submission to decision45.2 weeks17.0 weeks
Appeals lodged / allowed5 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Quarterland Road, Islandmageebattery storage75approved, not built3.4
Ballykeel Wind Farmwind farm16.1approved, not built4.7
Red Braesolar farm5permission expired7.7
Mullaghsandall Road wind farmwind farm10refused on appeal7.7
Land at Dobbs Estatesolar farm21.8abandoned8.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.8169, -5.7818).