Sheirdrim Renewable Energy Development Solar (20 MW)

Sheirdrim Renewable Energy Development Solar is a 20 MW solar farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 26 June 2023; the record was last updated on 26 June 2023. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

20 MWsolar farm
refused on appealstatus in REPD
26 June 2023record last updated
Argyll and Butecouncil area

Planning timeline

DateStage
10 October 2019Application submitted
21 March 2021Appeal lodged
26 June 2023Appeal refused

Project details

Technology
solar farm
Capacity
20 MW
Status (REPD)
refused on appeal
Record last updated
26 June 2023
Operator or applicant
ScottishPower Renewables
Planning authority
Scottish Government (S36)
Planning application reference
ECU00001957
Address (REPD)
Sheirdrim Windfarm East Of, Clachan, Tarbert, Strathclyde
Council area (by location)
Argyll and Bute
Name in REPD
Sheirdrim Renewable Energy Development - Solar
REPD reference
7584

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Sheirdrim Renewable Energy Development Windwind farm114refused on appeal<0.1
Sheirdrim Renewable Energy Development Batterybattery storage38refused on appeal<0.1
Freasdail Wind Farmwind farm22.5operational1.8
Gartnagrenachwind farm24application withdrawn1.8
Eascairt Wind Farmwind farm26approved, not built3.4
High Constellation Wind Farmwind farm48approved, not built6.7
Corriechreivewind farm30refused8.1
Earraghail Renewable Energy Developmentwind farm78application submitted8.9
Earraghail Renewable Energy Developmentsolar farm5refused9.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.7633, -5.4852).