Gartnagrenach (24 MW wind farm)
Gartnagrenach is a 24 MW wind farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 7 April 2006; the record was last updated on 7 April 2006.
24 MWwind farm
application withdrawnstatus in REPD
7 April 2006record last updated
Argyll and Butecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 7 April 2006 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 24 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 7 April 2006
- Operator or applicant
- Atlantic Energy
- Planning authority
- Argyll and Bute
- Planning application reference
- not recorded
- Turbines
- 14
- Address (REPD)
- Gartnagrenach, Argyll and Bute
- Council area (by location)
- Argyll and Bute
- REPD reference
- 2912
Who decides
| Applications | Argyll and Bute | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 49 | 10,236 |
| Refused | 22 (45%) | 19% |
| Solar refused | 0 of 4 | 12% |
| Onshore wind refused | 21 of 41 | 45% |
| Battery storage refused | 1 of 4 | 16% |
| Median time from submission to decision | 53.3 weeks | 17.0 weeks |
| Appeals lodged / allowed | 5 / 4 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Sheirdrim Renewable Energy Development Wind | wind farm | 114 | refused on appeal | 1.8 |
| Sheirdrim Renewable Energy Development Solar | solar farm | 20 | refused on appeal | 1.8 |
| Sheirdrim Renewable Energy Development Battery | battery storage | 38 | refused on appeal | 1.8 |
| Freasdail Wind Farm | wind farm | 22.5 | operational | 2.0 |
| Eascairt Wind Farm | wind farm | 26 | approved, not built | 5.2 |
| Corriechreive | wind farm | 30 | refused | 8.1 |
| High Constellation Wind Farm | wind farm | 48 | approved, not built | 8.2 |
| Airigh Wind Farm | wind farm | 58.8 | abandoned | 8.7 |
| Earraghail Renewable Energy Development | wind farm | 78 | application submitted | 9.0 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.7763, -5.5022).