Siddington Solar Farm (19.9 MW)

Siddington Solar Farm is a 19.9 MW solar farm project in Cotswold, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: under construction; the record was last updated on 31 July 2023.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

19.9 MWsolar farm
under constructionstatus in REPD
31 July 2023record last updated
Cotswoldcouncil area

Planning timeline

DateStage
23 December 2020Application submitted
21 May 2021Planning permission granted

Project details

Technology
solar farm
Capacity
19.9 MW
Status (REPD)
under construction
Record last updated
31 July 2023
Operator or applicant
Gresham House / Anesco Limited
Planning authority
Cotswold
Planning application reference
20/04499/FUL
Site area
73.7 ha
Address (REPD)
E/O Ashton Road
Council area (by location)
Cotswold
Time to decision
21 weeks
Contracts for Difference
AR4
REPD reference
8257

Who decides

ApplicationsCotswoldUK
Decided applications (solar, wind, battery)2010,236
Refused2 (10%)19%
Solar refused2 of 1812%
Battery storage refused0 of 216%
Median time from submission to decision16.6 weeks17.0 weeks
Appeals lodged / allowed0 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Spratsgate Lane, Siddington Solar Farm and Battery Energy Storage Systemsolar farm25application submitted1.8
Cirencester Solar Farmsolar farm23operational3.1
Crucis Parksolar farm12.5operational4.6
Cooles Farm, Minety Solar Park/Battery Storagesolar farm8application submitted6.3
Kemble Wicksolar farm49.9operational6.3
Malmesbury Road Solar Farmsolar farm13approved, not built7.7
Fairholme, Minetybattery storage50approved, not built9.1
Minety South 2battery storage50operational9.7
Welsh Way Solar PV Farmsolar farm13approved, not built9.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.6906, -1.9529).