Solar PV Panels (39 MW)

Solar PV Panels is a 39 MW solar farm project in North Northamptonshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 5 November 2024, no decision recorded; the record was last updated on 2 December 2024.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

39 MWsolar farm
application submittedstatus in REPD
2 December 2024record last updated
North Northamptonshirecouncil area

Planning timeline

DateStage
5 November 2024Application submitted

Project details

Technology
solar farm
Capacity
39 MW
Status (REPD)
application submitted
Record last updated
2 December 2024
Operator or applicant
Buccleuch Estates Limited
Planning authority
North Northamptonshire
Planning application reference
NK/2024/0599
Site area
105.0 ha
Address (REPD)
Newton Road, N/O Newton, Kettering
Council area (by location)
North Northamptonshire
Name in REPD
Oakley Bush Solar Farm - Solar PV Panels
REPD reference
15269

Recorded together with Oakley Bush Solar Farm (10 MW battery storage, application submitted).

Who decides

ApplicationsNorth NorthamptonshireUK
Decided applications (solar, wind, battery)6810,236
Refused11 (16%)19%
Solar refused2 of 4412%
Onshore wind refused5 of 1145%
Battery storage refused4 of 1316%
Median time from submission to decision11.4 weeks17.0 weeks
Appeals lodged / allowed1 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
New Albion Wind Farmwind farm14.4operational3.4
Brigstock Solar Farmsolar farm49.9approved, not built4.1
Grafton Underwoodsolar farm38approved, not built4.8
Gaultney Solar Parksolar farm20.5operational6.3
RAF Desboroughsolar farm49.9permission expired6.6
Solar Photovoltaic Panelssolar farm39.3application submitted6.8
Barnwell Manor Wind Farmwind farm10refused on appeal8.6
Bryant Field Solar Parksolar farm5permission expired9.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.4467, -0.7052).