Steeley Lane, Steetley Solar Photovoltaic Farm (18.7 MW)

Steeley Lane, Steetley Solar Photovoltaic Farm is an 18.7 MW solar farm project in Bassetlaw, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 23 November 2023, no decision recorded; the record was last updated on 18 December 2023. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

18.7 MWsolar farm
application submittedmay be out of datestatus in REPD
18 December 2023record last updated
Bassetlawcouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
23 November 2023Application submitted

Project details

Technology
solar farm
Capacity
18.7 MW
Status (REPD)
application submitted
Record last updated
18 December 2023
Operator or applicant
Renewable Connections Developments Limited
Planning authority
Bassetlaw
Planning application reference
23/01399/FUL
Site area
21.5 ha
Address (REPD)
and To East Of Steeley Lane Steetley
Council area (by location)
Bassetlaw
Name in REPD
Steeley Lane, Steetley - Solar Photovoltaic Farm
REPD reference
13679

Who decides

ApplicationsBassetlawUK
Decided applications (solar, wind, battery)4010,236
Refused5 (12%)19%
Solar refused0 of 2512%
Onshore wind refused5 of 745%
Battery storage refused0 of 816%
Median time from submission to decision13.9 weeks17.0 weeks
Appeals lodged / allowed2 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Hunciecroft Farmsolar farm8operational4.4
Rayton Farm Lane Solar Farmsolar farm34approved, not built4.7
Manton Woodbattery storage10permission expired5.2
Creswell Solar Parksolar farm5operational5.4
Hundred Acre Lane, Carlton In Lindricksolar farm34application submitted6.7
Frithwood Farm, Frithwood Lane Solar Farmsolar farm25approved, not built6.8
Welbeck Solar / Hazel Gapsolar farm16operational7.5
Welbeck Collierysolar farm11.3operational8.5
Land at Bolsover Moor Quarrysolar farm5operational8.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.2979, -1.1678).