Steeraway Farm Solar Farm (30 MW)

Steeraway Farm Solar Farm is a 30 MW solar farm project in Telford and Wrekin, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: under construction since 1 September 2025; the record was last updated on 26 January 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

30 MWsolar farm
under constructionstatus in REPD
26 January 2026record last updated
Telford and Wrekincouncil area

Planning timeline

DateStage
28 October 2021Application submitted
8 April 2022Refused by the planning authority
18 October 2022Appeal lodged
9 May 2023Planning permission granted
9 May 2023Appeal allowed
1 September 2025Construction started

Project details

Technology
solar farm
Capacity
30 MW
Status (REPD)
under construction
Record last updated
26 January 2026
Operator or applicant
Enviromena
Planning authority
Telford and Wrekin
Planning application reference
TWC/2021/1071
Appeal reference
APP/C3240/W/22/3308481
Site area
53.0 ha
Address (REPD)
Steeraway Farm, Limekiln Lane, Wellington, Telford
Council area (by location)
Telford and Wrekin
Time to decision
80 weeks
Contracts for Difference
AR6
Name in REPD
Steeraway Farm - Solar Farm
REPD reference
10089

Who decides

ApplicationsTelford and WrekinUK
Decided applications (solar, wind, battery)3410,236
Refused6 (18%)19%
Solar refused1 of 2512%
Battery storage refused5 of 916%
Median time from submission to decision12.7 weeks17.0 weeks
Appeals lodged / allowed2 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
New Works Lane Solar Farmsolar farm30application submitted0.6
Tiddiecross Solar Farmsolar farm10.5operational4.8
Tiddiecross Solar Farm & Battery Storagesolar farm14approved, not built4.8
Hollydale, Buildwas Roadbattery storage40approved, not built5.1
Buildwasbattery storage100approved, not built5.1
Rushmoor Lane Farm (Cheshire Coppice)solar farm5operational5.6
Granville Road Solar Farmsolar farm5operational7.3
Church Farm, Withington Solar Farmsolar farm25approved, not built8.4
Kemberton Solar Farmsolar farm22approved, not built8.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.6835, -2.5113).