Tangy Wind Farm Extension/Tangy 2 (6 MW)

Tangy Wind Farm Extension/Tangy 2 is a 6 MW wind farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 17 June 2011; the record was last updated on 25 January 2012.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6 MWwind farm
operationalstatus in REPD
25 January 2012record last updated
Argyll and Butecouncil area

Planning timeline

DateStage
1 July 2004Application submitted
1 September 2005Planning permission granted
1 May 2006Construction started
17 June 2011Operational

Project details

Technology
wind farm
Capacity
6 MW
Status (REPD)
operational
Record last updated
25 January 2012
Operator or applicant
Scottish and Southern Energy (SSE)
Planning authority
Argyll and Bute
Planning application reference
0401291/DET
Turbines
7
Address (REPD)
Kilkenzie , Campbelltown
Council area (by location)
Argyll and Bute
Time to decision
61 weeks
REPD reference
4024

Who decides

ApplicationsArgyll and ButeUK
Decided applications (solar, wind, battery)4910,236
Refused22 (45%)19%
Solar refused0 of 412%
Onshore wind refused21 of 4145%
Battery storage refused1 of 416%
Median time from submission to decision53.3 weeks17.0 weeks
Appeals lodged / allowed5 / 4—

Other large projects within 10 km

ProjectTypeMWStatuskm
Cnoc Buidhe Windfarmwind farm191application submitted7.7
Tangy Wind Farm/Tangy 1wind farm12.8operational8.8
Tangy Wind Farm - repowering/Tangy 3wind farm36.8permission expired8.8
Tangy 4 Wind Farmwind farm80approved, not built8.8
Beinn an Tuirc Windfarm Phase 3wind farm49.9under construction9.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.4786, -5.5305).