Tangy Wind Farm/Tangy 1 (12.8 MW)

Tangy Wind Farm/Tangy 1 is a 12.8 MW wind farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 26 December 2002; the record was last updated on 18 January 2012.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

12.8 MWwind farm
operationalstatus in REPD
18 January 2012record last updated
Argyll and Butecouncil area

Planning timeline

DateStage
12 June 2001Application submitted
15 February 2002Planning permission granted
26 December 2002Operational

Project details

Technology
wind farm
Capacity
12.8 MW
Status (REPD)
operational
Record last updated
18 January 2012
Operator or applicant
Border Wind / Scottish and Southern (SSE)
Planning authority
Argyll and Bute
Planning application reference
94/0739/DET
Turbines
15
Address (REPD)
Kilkenzie , Cambeltown
Council area (by location)
Argyll and Bute
Time to decision
35 weeks
REPD reference
3467

Who decides

ApplicationsArgyll and ButeUK
Decided applications (solar, wind, battery)4910,236
Refused22 (45%)19%
Solar refused0 of 412%
Onshore wind refused21 of 4145%
Battery storage refused1 of 416%
Median time from submission to decision53.3 weeks17.0 weeks
Appeals lodged / allowed5 / 4—

Other large projects within 10 km

ProjectTypeMWStatuskm
Tangy Wind Farm - repowering/Tangy 3wind farm36.8permission expired<0.1
Tangy 4 Wind Farmwind farm80approved, not built<0.1
Auchadaduie Wind Farmwind farm6.9operational5.5
Beinn an Tuirc Windfarm Phase 3wind farm49.9under construction6.6
Blary Hill Wind Farmwind farm35operational8.2
Creggan Wind Farmwind farm54refused on appeal8.5
Tangy Wind Farm Extension/Tangy 2wind farm6operational8.8
Cnoc Buidhe Windfarmwind farm191application submitted8.8
Wind Turbines at Allt Domhain Wind Farmwind farm64.8application submitted9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.4953, -5.6666).