Wind Turbines at Allt Domhain Wind Farm (64.8 MW)

Wind Turbines at Allt Domhain Wind Farm is a 64.8 MW wind farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 31 July 2025, no decision recorded; the record was last updated on 12 September 2025. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

64.8 MWwind farm
application submittedstatus in REPD
12 September 2025record last updated
Argyll and Butecouncil area

Planning timeline

DateStage
31 July 2025Application submitted

Project details

Technology
wind farm
Capacity
64.8 MW
Status (REPD)
application submitted
Record last updated
12 September 2025
Operator or applicant
Energiekontor UK Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00003231
Address (REPD)
Allt Domhain Wind Farm, Glenbarr, Tarbert
Council area (by location)
Argyll and Bute
Name in REPD
Allt Domhain Wind Farm, Glenbarr - Wind Turbines
REPD reference
19493

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Creggan Wind Farmwind farm54refused on appeal1.5
Blary Hill Wind Farmwind farm35operational3.3
Auchadaduie Wind Farmwind farm6.9operational4.4
Largie Wind Farmwind farm14.9refused5.7
Clachaig Glenwind farm60approved, not built6.0
Beinn an Tuirc Windfarm Phase 3wind farm49.9under construction6.3
Beinn an Tuirc Phase 2wind farm43.7operational6.6
Beinn an Tuircwind farm29.7operational6.6
Cnoc Donn Arniclewind farm15operational7.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.5802, -5.6919).