Largie Wind Farm (14.9 MW)

Largie Wind Farm is a 14.9 MW wind farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 17 November 1998; the record was last updated on 23 August 2004.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

14.9 MWwind farm
refusedstatus in REPD
23 August 2004record last updated
Argyll and Butecouncil area

Planning timeline

DateStage
24 August 1994Application submitted
17 November 1998Refused by the planning authority

Project details

Technology
wind farm
Capacity
14.9 MW
Status (REPD)
refused
Record last updated
23 August 2004
Operator or applicant
Eurus Energy / Ecogen
Planning authority
Argyll and Bute
Planning application reference
94/00772/DET
Address (REPD)
Tangy Farm, Kilkenzie Argyll and Bute
Council area (by location)
Argyll and Bute
Time to decision
221 weeks
REPD reference
3451

Who decides

ApplicationsArgyll and ButeUK
Decided applications (solar, wind, battery)4910,236
Refused22 (45%)19%
Solar refused0 of 412%
Onshore wind refused21 of 4145%
Battery storage refused1 of 416%
Median time from submission to decision53.3 weeks17.0 weeks
Appeals lodged / allowed5 / 4—

Other large projects within 10 km

ProjectTypeMWStatuskm
Beinn an Tuircwind farm29.7operational2.3
Beinn an Tuirc Phase 2wind farm43.7operational2.3
Cnoc Donn Arniclewind farm15operational2.6
Clachaig Glenwind farm60approved, not built3.3
Blary Hill Wind Farmwind farm35operational3.6
Beinn an Tuirc Windfarm Phase 3wind farm49.9under construction5.1
Deucheran Hillwind farm15.8operational5.6
Wind Turbines at Allt Domhain Wind Farmwind farm64.8application submitted5.7
Auchadaduie Wind Farmwind farm6.9operational6.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.5916, -5.6041).