Blary Hill Wind Farm (35 MW)

Blary Hill Wind Farm is a 35 MW wind farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 January 2022; the record was last updated on 16 January 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

35 MWwind farm
operationalstatus in REPD
16 January 2026record last updated
Argyll and Butecouncil area

Planning timeline

DateStage
22 August 2014Application submitted
30 April 2015Refused by the planning authority
1 June 2015Appeal lodged
23 June 2017Planning permission granted
23 June 2017Appeal allowed
25 May 2020Construction started
1 January 2022Operational

Project details

Technology
wind farm
Capacity
35 MW
Status (REPD)
operational
Record last updated
16 January 2026
Operator or applicant
Renewables Infrastructure Group / Renewable Energy Systems (RES)
Planning authority
Argyll and Bute
Planning application reference
14/01978/PP
Appeal reference
PPA-130-2052
Turbines
14
Turbine height
110 m
Address (REPD)
Land North Of Loch Arnicle (including C20 To The A83T) Barr Glen By Glenbarr Argyll And Bute
Council area (by location)
Argyll and Bute
Time to decision
148 weeks
REPD reference
4605

Who decides

ApplicationsArgyll and ButeUK
Decided applications (solar, wind, battery)4910,236
Refused22 (45%)19%
Solar refused0 of 412%
Onshore wind refused21 of 4145%
Battery storage refused1 of 416%
Median time from submission to decision53.3 weeks17.0 weeks
Appeals lodged / allowed5 / 4—

Other large projects within 10 km

ProjectTypeMWStatuskm
Auchadaduie Wind Farmwind farm6.9operational2.8
Beinn an Tuirc Windfarm Phase 3wind farm49.9under construction3.2
Wind Turbines at Allt Domhain Wind Farmwind farm64.8application submitted3.3
Beinn an Tuirc Phase 2wind farm43.7operational3.6
Beinn an Tuircwind farm29.7operational3.6
Largie Wind Farmwind farm14.9refused3.6
Creggan Wind Farmwind farm54refused on appeal3.9
Cnoc Donn Arniclewind farm15operational4.9
Clachaig Glenwind farm60approved, not built5.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.5683, -5.6435).