Auchadaduie Wind Farm (6.9 MW)

Auchadaduie Wind Farm is a 6.9 MW wind farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 21 November 2018; the record was last updated on 26 November 2018.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6.9 MWwind farm
operationalstatus in REPD
26 November 2018record last updated
Argyll and Butecouncil area

Planning timeline

DateStage
18 January 2012Application submitted
21 July 2014Planning permission granted
15 January 2018Construction started
21 November 2018Operational

Project details

Technology
wind farm
Capacity
6.9 MW
Status (REPD)
operational
Record last updated
26 November 2018
Operator or applicant
Fyne Futures
Planning authority
Argyll and Bute
Planning application reference
11/02525/PP
Turbines
3
Address (REPD)
Land South Of Auchadaduie Barr Glen Glenbarr Kintyre
Council area (by location)
Argyll and Bute
Time to decision
131 weeks
REPD reference
4184

Who decides

ApplicationsArgyll and ButeUK
Decided applications (solar, wind, battery)4910,236
Refused22 (45%)19%
Solar refused0 of 412%
Onshore wind refused21 of 4145%
Battery storage refused1 of 416%
Median time from submission to decision53.3 weeks17.0 weeks
Appeals lodged / allowed5 / 4—

Other large projects within 10 km

ProjectTypeMWStatuskm
Blary Hill Wind Farmwind farm35operational2.8
Beinn an Tuirc Windfarm Phase 3wind farm49.9under construction3.1
Creggan Wind Farmwind farm54refused on appeal3.9
Wind Turbines at Allt Domhain Wind Farmwind farm64.8application submitted4.4
Tangy Wind Farm/Tangy 1wind farm12.8operational5.5
Tangy 4 Wind Farmwind farm80approved, not built5.5
Tangy Wind Farm - repowering/Tangy 3wind farm36.8permission expired5.5
Beinn an Tuircwind farm29.7operational5.6
Beinn an Tuirc Phase 2wind farm43.7operational5.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.5447, -5.6602).