Tiddlywink Barn Battery Storage Power Plant (20 MW)

Tiddlywink Barn Battery Storage Power Plant is a 20 MW battery storage project in Wiltshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: abandoned; the record was last updated on 14 June 2022.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

20 MWbattery storage
abandonedstatus in REPD
14 June 2022record last updated
Wiltshirecouncil area

Planning timeline

DateStage
24 August 2021Application submitted

Project details

Technology
battery storage (stand-alone storage)
Capacity
20 MW
Status (REPD)
abandoned
Record last updated
14 June 2022
Operator or applicant
Mcballester Limited
Planning authority
Wiltshire
Planning application reference
PL/2021/07610
Address (REPD)
The Barn south east of 8 Tiddlywink, South From Yatton Keynell To Crossroads, Yatton Keynell, Chippenham
Council area (by location)
Wiltshire
REPD reference
9552

Earlier applications for this site

ApplicationMWSubmittedOutcome
Tiddlywink Barn 17/10611/FUL59 November 2017refused 21 December 2017
Tiddlywink Barn 19/06775/FUL1015 July 2019withdrawn 10 September 2019

Who decides

ApplicationsWiltshireUK
Decided applications (solar, wind, battery)14010,236
Refused18 (13%)19%
Solar refused13 of 11012%
Onshore wind refused1 of 145%
Battery storage refused4 of 2916%
Median time from submission to decision20.9 weeks17.0 weeks
Appeals lodged / allowed5 / 7—

Other large projects within 10 km

ProjectTypeMWStatuskm
Solar Farm at East of Battens Farmsolar farm10approved, not built<0.1
Battens Farm Solar Parksolar farm11operational1.4
Castle Combe Circuitsolar farm12operational2.6
Leigh Delamere Solar farm & Battery storagesolar farm49.9under construction3.3
Red Barn Solar Farm & Battery Storagesolar farm40approved, not built4.7
Lake Farmsolar farm5operational6.8
Hullavington Solar Parksolar farm7operational7.1
Brockleaze, Neston Park Estatebattery storage450application submitted7.8
Manor Farm (Wiltshire)solar farm6.3operational8.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.4809, -2.1855).