Vine Farm Solar Park (45 MW)

Vine Farm Solar Park is a 45 MW solar farm project in South Cambridgeshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 15 March 2016; the record was last updated on 2 February 2017.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

45 MWsolar farm
operationalstatus in REPD
2 February 2017record last updated
South Cambridgeshirecouncil area

Planning timeline

DateStage
9 May 2014Application submitted
6 August 2014Secretary of State intervened
2 September 2014Secretary of State granted
1 August 2015Construction started
15 March 2016Operational

Project details

Technology
solar farm
Capacity
45 MW
Status (REPD)
operational
Record last updated
2 February 2017
Operator or applicant
Allianz
Planning authority
South Cambridgeshire
Planning application reference
S/1067/14/FL
Site area
100.0 ha
Address (REPD)
Vine House, Vine Farm, High Street, Shingay Cum Wendy, Royston
Council area (by location)
South Cambridgeshire
REPD reference
2329

Who decides

ApplicationsSouth CambridgeshireUK
Decided applications (solar, wind, battery)4810,236
Refused10 (21%)19%
Solar refused6 of 4012%
Onshore wind refused4 of 545%
Battery storage refused0 of 316%
Median time from submission to decision17.1 weeks17.0 weeks
Appeals lodged / allowed2 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Croydon Solar Farmsolar farm5application withdrawn0.9
Croydon / Church Farm (Royston)solar farm16.5operational2.1
Hoback Farmsolar farm13.1operational2.9
Bassingbourn Solar Farmsolar farm14.4operational4.9
Bury Lane Fruit Farmsolar farm24operational6.0
Royston Solar Farm (Phase 1) (a)solar farm5operational6.0
Royston Solar Farm (Phase 1)solar farm5permission expired6.0
Highfield Wind Farmwind farm12.5appeal withdrawn6.2
River Mel Solar Farm & Battery Storage Systemsolar farm25application submitted6.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.1112, -0.0691).