Windburn Wind Farm (65 MW)

Windburn Wind Farm is a 65 MW wind farm project in Clackmannanshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 5 June 2025, no decision recorded; the record was last updated on 11 August 2025. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

65 MWwind farm
application submittedstatus in REPD
11 August 2025record last updated
Clackmannanshirecouncil area

Planning timeline

DateStage
5 June 2025Application submitted

Project details

Technology
wind farm
Capacity
65 MW
Status (REPD)
application submitted
Record last updated
11 August 2025
Operator or applicant
Octopus Energy / Wind 2 Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00004782
Turbines
13
Turbine height
150 m
Address (REPD)
Windburn Wind Farm, Hillfoots Business Village, Alva
Council area (by location)
Clackmannanshire
REPD reference
13625

The scheme also includes 35 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Bankhead Farmbattery storage25approved, not built1.1
Devilla Energy Storage Facilitybattery storage500under construction2.1
Balhearty Solarsolar farm5operational4.7
Forthbankwind farm5refused5.9
Rhodders Wind Farmwind farm12operational6.0
Burnfoot Hillwind farm26operational6.6
Manor Powissolar farm5application withdrawn6.6
Farm at Lower Polmaisesolar farm5permission expired6.7
Burnfoot East Wind Farm (further extension)wind farm10.8operational6.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (56.1504, -3.7868).