Classic Marble Showers, Omagh Road (73 MW battery storage)

Classic Marble Showers, Omagh Road is a 73 MW battery storage project in Fermanagh and Omagh, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 19 June 2026, not yet built; the record was last updated on 13 July 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

73 MWbattery storage
approved, not builtstatus in REPD
13 July 2026record last updated
Fermanagh and Omaghcouncil area

Planning timeline

DateStage
10 July 2024Application submitted
19 June 2026Planning permission granted
19 June 2031Permission due to expire (unless work starts)

Project details

Technology
battery storage (stand-alone storage)
Capacity
73 MW
Status (REPD)
approved, not built
Record last updated
13 July 2026
Operator or applicant
Green Frog Power (Gort BESS) Limited
Planning authority
Mid Ulster
Planning application reference
LA10/2024/0613/F
Address (REPD)
South of Classic Marble (Showers) Ltd, 185 Omagh Road, Garvaghy
Council area (by location)
Fermanagh and Omagh
Time to decision
101 weeks
Name in REPD
Classic Marble Showers, Omagh Road - Battery Energy Storage
REPD reference
16899

Who decides

ApplicationsMid UlsterUK
Decided applications (solar, wind, battery)4910,236
Refused8 (16%)19%
Solar refused0 of 912%
Onshore wind refused8 of 3345%
Battery storage refused0 of 716%
Median time from submission to decision68.9 weeks17.0 weeks
Appeals lodged / allowed5 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Omagh Road, Garvaghybattery storage50approved, not built0.8
Shantavy Scotchwind farm14approved, not built1.5
Shantavny Scotchwind farm16.1operational2.2
Slieve Divena Phase 2 Wind Farmwind farm18.8operational2.5
Slieve Divena Phase 1 Wind Farmwind farm30operational2.5
Altamuskin Extensionwind farm7.1operational2.9
Altamuskinwind farm7.1operational4.2
Slieve Beaghwind farm30application withdrawn6.1
Crockbaravally Wind Farmwind farm7.5operational8.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.4871, -7.1183).