Colinglen Road Battery (49.9 MW)

Colinglen Road Battery is a 49.9 MW battery storage project in Lisburn and Castlereagh, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 31 July 2020, no decision recorded; the record was last updated on 15 August 2022. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWbattery storage
application submittedmay be out of datestatus in REPD
15 August 2022record last updated
Lisburn and Castlereaghcouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
31 July 2020Application submitted

Project details

Technology
battery storage (stand-alone storage)
Capacity
49.9 MW
Status (REPD)
application submitted
Record last updated
15 August 2022
Operator or applicant
Hannahstown BESS
Planning authority
Belfast
Planning application reference
LA04/2020/1724/F
Address (REPD)
Approximately 700m North Of, 28 Colinglen Road, Dunmurry, Belfast, Co Antrim
Council area (by location)
Lisburn and Castlereagh
REPD reference
8033

Who decides

Belfast has 5 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

Other large projects within 10 km

ProjectTypeMWStatuskm
Ballyutoag Wind Farmwind farm11.5approved, not built7.5
Battery Storage System Development in Lisburnbattery storage150approved, not built7.6
Ballinderry Road Solar Phase 1 (Lisburn)solar farm13.5operational7.8
Lands West of Belfast Roadsolar farm10operational7.9
Ballinderry Road Solar Phase 2 (Lisburn)solar farm7operational8.0
Knockcairn Roadsolar farm6.5operational8.8
Hillside Solar Farmsolar farm25.2operational9.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.5795, -6.0398).