Dorset Green Solar Farm (5 MW)

Dorset Green Solar Farm is a 5 MW solar farm project in Bournemouth, Christchurch and Poole, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 5 April 2023; the record was last updated on 10 May 2022.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5 MWsolar farm
operationalstatus in REPD
10 May 2022record last updated
Bournemouth, Christchurch and Poolecouncil area

Planning timeline

DateStage
12 March 2021Application submitted
23 July 2021Planning permission granted
28 May 2022Construction started
5 April 2023Operational

Project details

Technology
solar farm
Capacity
5 MW
Status (REPD)
operational
Record last updated
10 May 2022
Operator or applicant
Canford Renewable Energy Limited
Planning authority
Bournemouth, Christchurch and Poole
Planning application reference
APP/21/00400/F
Site area
11.7 ha
Address (REPD)
Canford Renewable Energy, Canford Recycling Centre, Arena Way, Wimborne,
Council area (by location)
Bournemouth, Christchurch and Poole
Time to decision
19 weeks
REPD reference
8858

Who decides

ApplicationsBournemouth, Christchurch and PooleUK
Decided applications (solar, wind, battery)3010,236
Refused6 (20%)19%
Solar refused6 of 2812%
Battery storage refused0 of 216%
Median time from submission to decision10.6 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Bedborough Farmsolar farm7operational5.6
Holes Baybattery storage15operational5.6
Parley Court Solar Farmsolar farm35approved, not built6.2
Hale Farmsolar farm8operational6.2
Chapel Lane Parley Solar Farm Phase 1solar farm20operational6.8
Parley Renewable Energy Park (PV)solar farm5refused7.2
Chapel Lane Parley Solar Farm Phase 2solar farm36operational7.3
Post Farm, Lytchett Minsterbattery storage32approved, not built7.3
Race farmsolar farm6.1operational8.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.7701, -1.9511).