East Farm (Clay Pit Hill) - Extension II (6 MW solar farm)

East Farm (Clay Pit Hill) - Extension II is a 6 MW solar farm project in Wiltshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 1 December 2018; the record was last updated on 18 December 2018.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6 MWsolar farm
application withdrawnstatus in REPD
18 December 2018record last updated
Wiltshirecouncil area

Planning timeline

DateStage
24 April 2018Application submitted
1 December 2018Application withdrawn

Project details

Technology
solar farm
Capacity
6 MW
Status (REPD)
application withdrawn
Record last updated
18 December 2018
Operator or applicant
J.M. Stratton and Co Ltd
Planning authority
Wiltshire
Planning application reference
18/03167/FUL
Site area
17.8 ha
Address (REPD)
Clay Pit Hill Codford Down Eas, Church Lane, Codford, Warminster,
Council area (by location)
Wiltshire
REPD reference
6655

Who decides

ApplicationsWiltshireUK
Decided applications (solar, wind, battery)14010,236
Refused18 (13%)19%
Solar refused13 of 11012%
Onshore wind refused1 of 145%
Battery storage refused4 of 2916%
Median time from submission to decision20.9 weeks17.0 weeks
Appeals lodged / allowed5 / 7—

Other large projects within 10 km

ProjectTypeMWStatuskm
Land at East Farmsolar farm6.8operational2.6
Land at East Farm - extensionsolar farm6operational2.6
East Codford Solar Farm Extension Phase 3solar farm18operational3.1
Deptford Farm solar parksolar farm7.8refused4.2
Codford Solar Farm Phase 4solar farm18approved, not built4.4
Mill Farm, Teffontbattery storage8.5approved, not built9.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.1574, -2.0354).