Foxwalks Solar Farm - Extension (13 MW)

Foxwalks Solar Farm - Extension is a 13 MW solar farm project in Bromsgrove, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 25 March 2026, no decision recorded; the record was last updated on 27 April 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

13 MWsolar farm
application submittedstatus in REPD
27 April 2026record last updated
Bromsgrovecouncil area

Planning timeline

DateStage
25 March 2026Application submitted

Project details

Technology
solar farm
Capacity
13 MW
Status (REPD)
application submitted
Record last updated
27 April 2026
Operator or applicant
Spring Dev 10 Limited
Planning authority
Bromsgrove
Planning application reference
26/00187/FUL
Site area
15.5 ha
Address (REPD)
S/O Timberhonger Lane, Timberhonger, Bromsgrove
Council area (by location)
Bromsgrove
REPD reference
19977

Who decides

Bromsgrove has 7 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

Other large projects within 10 km

ProjectTypeMWStatuskm
Foxwalks Farm, Grafton Lane Solar Farmsolar farm49.9approved, not built1.9
Rectory Farmsolar farm8.9refused on appeal2.6
Land at Rectory Farmsolar farm8.9application withdrawn3.0
Rectory Farm, Rectory Lanebattery storage30approved, not built3.3
Fibden Farm, Hampton Lovettsolar farm40approved, not built5.8
Fibden Farmsolar farm40application submitted6.4
Doverdale Solar Farm & Battery Storagebattery storage49.9operational9.2
Doverdale Solar Farm & Battery Storagesolar farm49.9operational9.2
Norchard Farmsolar farm8.8approved, not built9.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.3383, -2.0936).