Goodbush Hill (24 MW wind farm)

Goodbush Hill is a 24 MW wind farm project in South Lanarkshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 25 January 2010; the record was last updated on 25 January 2010.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

24 MWwind farm
application withdrawnstatus in REPD
25 January 2010record last updated
South Lanarkshirecouncil area

Planning timeline

DateStage
25 January 1996Application submitted
25 January 2010Application withdrawn

Project details

Technology
wind farm
Capacity
24 MW
Status (REPD)
application withdrawn
Record last updated
25 January 2010
Operator or applicant
Kenetech International
Planning authority
South Lanarkshire
Planning application reference
P/96/29
Turbines
60
Address (REPD)
Goodbush Hill, Near Strathaven
Council area (by location)
South Lanarkshire
REPD reference
3094

Who decides

ApplicationsSouth LanarkshireUK
Decided applications (solar, wind, battery)8910,236
Refused30 (34%)19%
Solar refused2 of 2012%
Onshore wind refused21 of 5645%
Battery storage refused7 of 1316%
Median time from submission to decision47.4 weeks17.0 weeks
Appeals lodged / allowed6 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
West Dykes Headwind farm7.6refused0.6
Wind turbines at Hawkwood Wind Farm Kype Highway Strathavenwind farm33application submitted3.6
Lochhead Farmwind farm6operational5.7
Kype Muir Wind Farmwind farm88.4operational5.8
Kype Muir Wind Farm Extensionwind farm67.2operational5.8
Low Drumclog Farm, Drumclog - 3 Wind Turbineswind farm20approved, not built6.4
Whitelee Wind Farm Battery Storage Extensionbattery storage50operational6.6
Cornhills Farm, Muttonhole Roadbattery storage49.9approved, not built6.8
Blantyre Muir Wind Farm extensionwind farm7.5operational6.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.681, -4.0691).