Lamonby Wind Farm (27 MW)

Lamonby Wind Farm is a 27 MW wind farm project in Westmorland and Furness, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 11 June 2009; the record was last updated on 11 June 2009.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

27 MWwind farm
application withdrawnstatus in REPD
11 June 2009record last updated
Westmorland and Furnesscouncil area

Planning timeline

DateStage
9 September 2005Application submitted
11 June 2009Application withdrawn

Project details

Technology
wind farm
Capacity
27 MW
Status (REPD)
application withdrawn
Record last updated
11 June 2009
Operator or applicant
Powergen /E.ON-UK
Planning authority
Westmorland and Furness
Planning application reference
05/0758
Turbines
9
Address (REPD)
Lamonby, Penrith, Cumbria
Council area (by location)
Westmorland and Furness
REPD reference
3553

Who decides

ApplicationsWestmorland and FurnessUK
Decided applications (solar, wind, battery)6810,236
Refused30 (44%)19%
Solar refused14 of 4212%
Onshore wind refused14 of 1945%
Battery storage refused2 of 716%
Median time from submission to decision34.6 weeks17.0 weeks
Appeals lodged / allowed9 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Town End Farmsolar farm5permission expired2.5
Land at Skelton Radio Transmitter Sitesolar farm5application withdrawn3.4
Berrier Hillwind farm22.5refused on appeal4.7
Solar Panels at Devonshire Squaresolar farm30refused5.0
Land at Calthwaitebattery storage6permission expired6.2
Hay Close Wind Farmwind farm10appeal withdrawn7.3
Moss Thorn Farmsolar farm5.8operational9.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.711, -2.925).