Land at Skelton Radio Transmitter Site (5 MW solar farm)

Land at Skelton Radio Transmitter Site is a 5 MW solar farm project in Westmorland and Furness, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 12 April 2017; the record was last updated on 2 May 2017.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5 MWsolar farm
application withdrawnstatus in REPD
2 May 2017record last updated
Westmorland and Furnesscouncil area

Planning timeline

DateStage
23 October 2015Application submitted
12 April 2017Application withdrawn

Project details

Technology
solar farm
Capacity
5 MW
Status (REPD)
application withdrawn
Record last updated
2 May 2017
Operator or applicant
New Energy for the World
Planning authority
Westmorland and Furness
Planning application reference
15/0907
Site area
9.0 ha
Address (REPD)
Land at, Skelton Radio Transmitter Site, Skelton, Penrith, Cumbria, North West
Council area (by location)
Westmorland and Furness
REPD reference
5905

Who decides

ApplicationsWestmorland and FurnessUK
Decided applications (solar, wind, battery)6810,236
Refused30 (44%)19%
Solar refused14 of 4212%
Onshore wind refused14 of 1945%
Battery storage refused2 of 716%
Median time from submission to decision34.6 weeks17.0 weeks
Appeals lodged / allowed9 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Town End Farmsolar farm5permission expired0.9
Solar Panels at Devonshire Squaresolar farm30refused2.4
Land at Calthwaitebattery storage6permission expired2.8
Lamonby Wind Farmwind farm27application withdrawn3.4
Hay Close Wind Farmwind farm10appeal withdrawn4.5
Berrier Hillwind farm22.5refused on appeal6.9
Moss Thorn Farmsolar farm5.8operational8.2
Roxane UK, Armathwaite Solar Array & Battery Storagesolar farm5approved, not built8.4
Bowscarsolar farm5permission expired8.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.7255, -2.8781).