Land at Calthwaite (6 MW battery storage)

Land at Calthwaite is a 6 MW battery storage project in Westmorland and Furness, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: planning permission expired on 19 December 2020; the record was last updated on 12 August 2019.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6 MWbattery storage
permission expiredstatus in REPD
12 August 2019record last updated
Westmorland and Furnesscouncil area

Planning timeline

DateStage
27 October 2017Application submitted
8 January 2018Planning permission granted
19 December 2020Permission expired

Project details

Technology
battery storage (stand-alone storage)
Capacity
6 MW
Status (REPD)
permission expired
Record last updated
12 August 2019
Operator or applicant
Balance Power
Planning authority
Westmorland and Furness
Planning application reference
17/0925
Address (REPD)
Land At Low Dyke, Calthwaite, Penrith,
Council area (by location)
Westmorland and Furness
Time to decision
10 weeks
REPD reference
7094

Who decides

ApplicationsWestmorland and FurnessUK
Decided applications (solar, wind, battery)6810,236
Refused30 (44%)19%
Solar refused14 of 4212%
Onshore wind refused14 of 1945%
Battery storage refused2 of 716%
Median time from submission to decision34.6 weeks17.0 weeks
Appeals lodged / allowed9 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Solar Panels at Devonshire Squaresolar farm30refused2.4
Land at Skelton Radio Transmitter Sitesolar farm5application withdrawn2.8
Hay Close Wind Farmwind farm10appeal withdrawn2.9
Town End Farmsolar farm5permission expired3.7
Roxane UK, Armathwaite Solar Array & Battery Storagesolar farm5approved, not built5.5
Lamonby Wind Farmwind farm27application withdrawn6.2
Bowscarsolar farm5permission expired7.5
Moss Thorn Farmsolar farm5.8operational8.7
Grisewind farm27refused on appeal9.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.7414, -2.8433).