Land West Of Sookholme Road (10 MW solar farm)

Land West Of Sookholme Road is a 10 MW solar farm project in Mansfield, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 1 June 2016; the record was last updated on 29 June 2016.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10 MWsolar farm
refusedstatus in REPD
29 June 2016record last updated
Mansfieldcouncil area

Planning timeline

DateStage
9 September 2015Application submitted
1 June 2016Refused by the planning authority

Project details

Technology
solar farm
Capacity
10 MW
Status (REPD)
refused
Record last updated
29 June 2016
Operator or applicant
Temporis Capital
Planning authority
Mansfield
Planning application reference
2015/0563/NT
Site area
18.2 ha
Address (REPD)
Land West of Sookholme Road, Sookholme, Mansfield
Council area (by location)
Mansfield
Time to decision
38 weeks
REPD reference
5671

Who decides

ApplicationsMansfieldUK
Decided applications (solar, wind, battery)1510,236
Refused3 (20%)19%
Solar refused3 of 1412%
Battery storage refused0 of 116%
Median time from submission to decision13.1 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Littlewood Lane Solarsolar farm5operational1.9
Brecks Solar Farmsolar farm45.4approved, not built2.5
Land At Debdale Lanesolar farm5operational4.3
Welbeck Collierysolar farm11.3operational4.6
Roseland Community Wind Farmwind farm12refused4.9
Frithwood Farm, Frithwood Lane Solar Farmsolar farm25approved, not built6.5
Ashland Solar Farmsolar farm5permission expired6.6
Land at Bolsover Moor Quarrysolar farm5operational6.9
Losk Lanewind farm5refused7.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.1937, -1.1855).