Brecks Solar Farm (45.4 MW)

Brecks Solar Farm is a 45.4 MW solar farm project in Mansfield, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 18 September 2023, not yet built; the record was last updated on 16 February 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

45.4 MWsolar farm
approved, not builtstatus in REPD
16 February 2026record last updated
Mansfieldcouncil area

Planning timeline

DateStage
25 May 2023Application submitted
18 September 2023Planning permission granted
18 September 2026Permission expired

Project details

Technology
solar farm
Capacity
45.4 MW
Status (REPD)
approved, not built
Record last updated
16 February 2026
Operator or applicant
Green Switch Capital Limited
Planning authority
Mansfield
Planning application reference
23/00656/FUL
Site area
37.8 ha
Address (REPD)
The North Of Brick Yard Road Gamston
Council area (by location)
Mansfield
Time to decision
17 weeks
Contracts for Difference
AR7a
REPD reference
10087

Who decides

ApplicationsMansfieldUK
Decided applications (solar, wind, battery)1510,236
Refused3 (20%)19%
Solar refused3 of 1412%
Battery storage refused0 of 116%
Median time from submission to decision13.1 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Welbeck Collierysolar farm11.3operational2.4
Land West Of Sookholme Roadsolar farm10refused2.5
Littlewood Lane Solarsolar farm5operational4.3
Welbeck Solar / Hazel Gapsolar farm16operational5.0
Netherfield Lanesolar farm19.7operational5.1
Land At Debdale Lanesolar farm5operational6.5
Hunciecroft Farmsolar farm8operational6.6
Frithwood Farm, Frithwood Lane Solar Farmsolar farm25approved, not built6.7
Creswell Solar Parksolar farm5operational6.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.2046, -1.1533).