PATES HILL WIND FARM Extension (6 MW)
PATES HILL WIND FARM Extension is a 6 MW wind farm project in West Lothian, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 31 January 2014; the record was last updated on 3 March 2014.
6 MWwind farm
application withdrawnstatus in REPD
3 March 2014record last updated
West Lothiancouncil area
Planning timeline
| Date | Stage |
|---|---|
| 11 July 2013 | Application submitted |
| 31 January 2014 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 6 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 3 March 2014
- Operator or applicant
- Longhill Wind Farm Ltd
- Planning authority
- West Lothian
- Planning application reference
- 0466/FUL/13
- Turbines
- 2
- Address (REPD)
- PATESHILL WIND FARM, HARBURN, WEST CALDER
- Council area (by location)
- West Lothian
- REPD reference
- 3363
Who decides
| Applications | West Lothian | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 41 | 10,236 |
| Refused | 5 (12%) | 19% |
| Solar refused | 1 of 17 | 12% |
| Onshore wind refused | 4 of 15 | 45% |
| Battery storage refused | 0 of 9 | 16% |
| Median time from submission to decision | 17.1 weeks | 17.0 weeks |
| Appeals lodged / allowed | 3 / 3 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Woolfords Farm - Onshore Wind Turbines | wind farm | 19.8 | approved, not built | 0.8 |
| Pates Hill | wind farm | 14 | operational | 1.1 |
| Longhill Burn Wind Farm | wind farm | 45.6 | under construction | 1.1 |
| Heathland Wind Farm | wind farm | 80 | approved, not built | 2.9 |
| Pearie Law 2 | wind farm | 14.4 | approved, not built | 3.2 |
| Pearie Law Wind Farm | wind farm | 19.2 | operational | 3.6 |
| Tormywheel | wind farm | 30.8 | operational | 3.6 |
| Tormywheel Wind Farm Extension | wind farm | 5 | approved, not built | 4.4 |
| Muirhall | wind farm | 12.3 | operational | 4.8 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.807, -3.6143).