Tormywheel Wind Farm Extension (5 MW)

Tormywheel Wind Farm Extension is a 5 MW wind farm project in West Lothian, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 6 March 2020, not yet built; the record was last updated on 10 February 2026. REPD records the planning permission as expiring on 6 March 2025, but the project holds a Contracts for Difference award (AR7a), so construction may have started. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5 MWwind farm
approved, not builtmay be out of datestatus in REPD
10 February 2026record last updated
West Lothiancouncil area

REPD records the planning permission as expiring on 6 March 2025, but the project holds a Contracts for Difference award (AR7a), so construction may have started.

Planning timeline

DateStage
30 March 2017Application submitted
6 March 2020Planning permission granted
6 March 2025Permission expired

Project details

Technology
wind farm
Capacity
5 MW
Status (REPD)
approved, not built
Record last updated
10 February 2026
Operator or applicant
Muirhall Energy
Planning authority
West Lothian
Planning application reference
LIVE/0226/FUL/17
Turbines
2
Turbine height
150 m
Address (REPD)
Tormywheel Wind Farm, Levenseath, Forth
Council area (by location)
West Lothian
Time to decision
153 weeks
Contracts for Difference
AR7a
REPD reference
6208

Who decides

ApplicationsWest LothianUK
Decided applications (solar, wind, battery)4110,236
Refused5 (12%)19%
Solar refused1 of 1712%
Onshore wind refused4 of 1545%
Battery storage refused0 of 916%
Median time from submission to decision17.1 weeks17.0 weeks
Appeals lodged / allowed3 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Tormywheelwind farm30.8operational0.8
Gladsmuir Hills Wind Farmwind farm41approved, not built2.1
Heathland Wind Farmwind farm80approved, not built2.1
Longhill Burn Wind Farmwind farm45.6under construction3.7
PATES HILL WIND FARM Extensionwind farm6application withdrawn4.4
Woolfords Farm - Onshore Wind Turbineswind farm19.8approved, not built4.8
Pates Hillwind farm14operational4.8
Starryshaw Wind Farmwind farm12refused5.7
Crofthill Wind Farmwind farm17refused6.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.801, -3.6831).